Technical Powerhouse: Peaking Run-of-River (PRoR)
Technical Powerhouse
Unlike traditional dams, the 570 MW WHPL is designed as a Peaking Run-of-River plant. This means it doesn’t just generate power constantly; it uses a small “pondage” (water storage) to save water during off-peak hours and release it during high-demand times.
Project Area: 2,613,600 sq.ft.
Ownership and Costs:
Nu 60 Billion
Glacial Monitoring:
58 Glaciers
Capacity:
570 MW.
Commencement Date:
January 20, 2026
Peaking Run-of-River plant
This home is ideal for growing families or professionals who value style, space, and a high-end outdoor lifestyle. The balance between smart tech integration, thoughtful layout, and community access makes it a rare find in today’s market.
Annual Energy Output: Estimated at 2,478.93 GWh.
The Winter Solution: While Bhutan is a net exporter of power, it often imports expensive electricity in winter. WHPL is specifically engineered to bridge this gap, ensuring the national grid remains self-sufficient even when river levels are at their lowest.
Infrastructure Layout: Features a 134-meter high concrete gravity dam at Gamanang and four high-efficiency 142.5 MW turbines housed in a massive underground cavern.
Any inquiry
Get in touch
