Advanced Basin Management (IWRM)
Property overview
Nestled in the heart of one of Austin’s most desirable suburban neighborhoods, this stunning two-story contemporary residence perfectly blends luxury, comfort, and practicality. Built in 2019, this 3,250 sq. ft. home sits on a quiet cul-de-sac just minutes from parks, top-rated schools, and premium shopping.
Project Area: 2,613,600 sq.ft.
Ownership and Costs:
Nu 60 Billion
Glacial Monitoring:
58 Glaciers
Capacity:
570 MW.
Commencement Date:
January 20, 2026
Integrated Water Resources Management
This home is ideal for growing families or professionals who value style, space, and a high-end outdoor lifestyle. The balance between smart tech integration, thoughtful layout, and community access makes it a rare find in today’s market.
Water Security Index: The basin’s health is monitored via the Wangchhu Water Security Index (WWSI). As of the latest comprehensive assessments, the basin was rated at a 3.9 score, indicating it is in a “capable stage” of water security.
Climate Resilience: With 58 glaciers in the basin, new projects like WHPL must account for glacial melt and seasonal fluctuations. Recent assessments by the Ministry of Energy and Natural Resources emphasized the importance of monitoring river inflows, which can surge from 200 to over 1,200 cumecs during extreme weather events.
Environmental Monitoring: While water quality in the basin remains generally good, there is increasing focus on monitoring downstream of urban centers like Thimphu and Paro to manage pollution from urban runoff.
Any inquiry
Get in touch
